Services

Full-stack fire protection

From portable extinguishers to high-rise pump rooms — designed for Fire NOC clearance and long-term reliability.

  • Design
  • Supply
  • Installation
  • Testing
  • NOC support
  • AMC
FE

Fire extinguishers

ABC, CO₂, clean-agent and specialty extinguishers with placement as per travel distance and hazard.

  • Supply & wall mounting
  • Refilling & hydrostatic testing
  • Floor-wise distribution plans
HR

Hose reel & first-aid

First-aid hose reel systems for early intervention on residential and hospitality floors.

  • Drum, valve & nozzle sets
  • Landing valve accessories
  • Floor-wise coverage
WR

Wet riser / downcomer

Vertical fire-fighting mains sized to height bands — wet riser, downcomer or dry riser as required.

  • Shaft piping & valves
  • Fire brigade inlet connections
  • Pressure zoning guidance
YH

Yard hydrant system

External hydrant rings for taller towers and hotel campuses with adequate spacing.

  • Hydrant posts & hose boxes
  • Ring main design
  • Pump interconnection
SP

Automatic sprinklers

Coverage for basements, hotels and high-rise residential as mandated by Table 7 notes.

  • Wet pipe layouts
  • Basement > 200 m² rules
  • Alarm valve & flow switches
AL

Detection & alarm

Manual call points, automatic detectors, panels, talk-back and public address where required.

  • MOEFA systems
  • Smoke / heat detection
  • PA & evacuation audio
TK

Water storage & pumps

Terrace tanks, underground static tanks and pump sets from 450 LPM to high-capacity dual sets.

  • UG & terrace tanks
  • Electric / diesel / jockey
  • Cluster tanks (hilly areas)
NC

Fire NOC & AMC

Documentation, provisional NOC support, inspection prep and annual maintenance contracts.

  • Compliance reports
  • Provisional NOC pathway
  • Scheduled servicing

Need a package for your tower?

Use the estimator for an indicative BOQ, then we refine quantities after a site walk-through and drawing review.

  • Apartment / dormitory height bands
  • Hotel floor-area thresholds (400 / 1000 m²)
  • Eatery & lodging room-count rules

Typical deliverables

  • Requirement matrix (R / NR) for your band
  • Indicative cost with GST
  • Equipment schedule after survey
  • As-built & test certificates for NOC